Untitled Document Home I About Us I Products I Clients I Contact Us
Clients.
Some of the projects supplied by NLE Electrical Ltd
DLR Eurotunnel
undeerground

Jubilee Line Extension
M25
M25 Redevelopment

Blackwall Tunnel


Case Study: Channel Tunnel Rail Link.

In 1996, London & Continental Railways (LCR) was selected by the Government to build and operate the high speed Channel Tunnel Rail Link (CTRL), and to own and operate the UK arm of the Eurostar international train service.

The Channel Tunnel Rail Link is the first new railway in England for over 60 years, and the first to operate at high speed (300Kph).

The contstruction team needed a network of reliable professional suppliers to keep the project on track. NLE Electrical Ltd was chosen as one of them.

We supplied the project with a huge range of products from sockets through to switch gear. Some of the largest orders received included:

HV / LV cable,
Lighting
Distribution Equipment
Motor Control Gear
Cable Management Solutions
Jointing & Glands.

 
credit cards
NLE Electrical Ltd. Registered in England Company No. 5552928

Designed by RedSpiderCreative Ltd
Digital Brand Strategy & New Media Development